Fleet Downtime Cost Calculator

QuickFit Tools · For fleets

What does a truck waiting for a part really cost you?

Enter how many trucks are down, how long they wait, and what each day of downtime costs. The calculator shows your total downtime bill and how much you save by getting the part faster.

Your downtime

All amounts in Canadian dollars. Estimates only.

Time from breakdown to back on the road
$
Loads or deliveries that truck would have earned
$
Driver wages, lease or financing, insurance, late-delivery penalties
Fill in your numbers and press Calculate to see what the wait is costing you.

How the downtime cost is calculated

  • Cost per truck per day = revenue lost per day + other daily costs.
  • Total downtime cost = trucks × days each truck sits × cost per truck per day.
  • Savings compare your current wait with getting the part in one day. If the part is already waiting on a shelf in Mississauga, the wait can be hours instead of days.

Typical Ontario figures: a heavy-duty truck earns roughly $1,000–$1,500 per working day, and fixed costs (driver, financing, insurance) add another $250–$450 per day even when the truck is parked. Use your own numbers for the most accurate result.

Cut the wait with in-stock cooling and AC parts

QuickFit Parts stocks radiators, charge air coolers, AC condensers, compressors and driers for Freightliner, Kenworth, Peterbilt, Volvo, Mack, International and Western Star. Check stock online or call (905) 237-7793, Monday to Saturday.